Bali Discovery Tours: Homepage
Bali Hotels, Bali Villas and Bali News from
Home Bali Contact Bali Practicalities Bali News Bali Services Bali Transportation Bali Sports Bali Excursions Bali Villas Bali Hotels
Home · News · The Long and Winding Road to South Bali
Bali Hotels, Bali Villas and Bali News from
Bali Hotels
Bali Villas
Special Deals!
MICE Handling
Bali Excursions
Culinary - Dining
Guided Tour
Bali Spas
Bali Sports
Bali Transportation
Car Rental - Selft Drive
Private Jet Charter
Bali News
Bali Services
Bali Practicalities
Bali Contact
Bali Career
Bali Update
Subscribe to our free weekly newsletter!
PATA header
PATA Gold Award 2007
Bali Update
PATA Gold Award Winner 2007
Bali Contact
Bali Discovery Tours
Komplek Pertokoan
Sanur Raya No. 27
Jl. By Pass Ngurah Rai,
Sanur, Bali, Indonesia

++62 361 286 283

++62 361 286 284

U.S.A. Fax:(toll free)

U.K. Fax:

Australian Fax:

++62 812 3819724

Bali Discovery

Bali News

The Long and Winding Road to South Bali

Latest Update on Ever-Changing Plans to Build a Bali Toll Way to Overcome Traffic Congestion.

Bali News: Bali, Indonesia, STB, JDR, Toll Way, Serangan Island, Bali Turtle Island, PT Jasa Marga, PT Pelindo III, PT Angkasa Pura, Bali Tourism Development Corporation (BTDC)
Click Image to Enlarge


The ever-changing scenario to build new highways in Bali to overcome traffic congestion has entered yet another chapter. DenPost and Bali Post report that plans to build a toll road from Serangan island to Tanjung Benoa are being put aside in favor of an overpass constructed atop environmentally sensitive mangrove forests connecting south Denpasar (Pedungan) and Nusa Dua.

A Bali provincial spokesperson confirmed this to the press on Wednesday, January 12, 2011, reporting that the central government has approved the new plan after considering all the alternatives, including toll ways, undersea tunnels and flyovers. In the end, a decision has been made to provide support for a 11.5 kilometer elevated highway constructed over the mangrove forests in Bali's south.

Endeavoring to minimize the impact of the new road on the environmentally critical mangrove forest, the highways will be suspended on 1,000 supporting columns with an access point included near the airport access road. The new highway will also be designed to accommodate motorcycles as well as cars and trucks.

To fast-track the program the government will immediately embark on a two-month survey prior to granting work contracts to build the road which, by presidential instruction, must be completed in time for a major APEC conference set for Bali in 2013. A toll road, the project will be financed and managed by four State-owned enterprises: PT Jasa Marga, PT Pelindo III, PT Angkasa Pura and the Bali Tourism Development Corporation (BTDC).

Separately, the vice-chairman of the Bali House of Representatives (DPRD-Bali), Ketut Suwandhi, told the press that earlier plans to build a toll-way and bridge connecting Serangan Island (Turtle Island) with Tanjung Benoa have been prevented from moving ahead due to uncertain land titles on Serangan island, complicated further by the reported bankruptcy of the Turtle Island Development Corporation (BTID).

Concerns were also raised that a toll road incorporating a bridge connecting Serangan island and Tanjung Benoa would interfere with shipping access to the port of Benoa and approach-departure paths for aircraft using the Bali Ngurah Rai Airport.

Suwandhi said he hoped the new proposal to build a highway suspended over Bali's mangrove forests would not endanger the natural environment. At the same time, he acknowledged that some damage to the mangrove is inevitable and must result from the construction process of the new highway and that development plans must include a provision for reforestation after the road is built.

According to NusaBali the preliminary cost of the new suspended highway is put at Rp. 1.4 trillion or US$155 million.

Introducing JDR

Meanwhile, a report in NusaBali makes a new addition to the Bali lexicon. While the name for the originally proposed toll-way bridge project is locally referred to as "Jembatan Serangan Tanjung Benoa" or "STB" the name now given to the suspended highway over the mangrove forest is "Jalan di Atas Rawa" or "JDR."

© Bali Discovery Tours. Articles may be quoted and reproduced if attributed to


Bali News by Bali Update
Subscribe to the Bali Update
Receive the latest news from Bali by email!

Our [Privacy Statement] explains how we handle the data you are providing.

Bali News by Bali Update
Explore the Archive of the Bali Update
Find related articles in our news archive!

or try to use Google Search :

Home · Bali Hotels · Bali Villas · Bali Excursions · Bali Sports · Bali News · Site Map · RSS

Bali News: More News
Cherishing the Children
St. Regis Resort Bali and Laguna Resort & Spa Raises More than $20,000 for UNICEF at Lavish Beachside Moonlight Dinner
Itís a Bali Holiday
Official National Holidays and Shared Holidays in Indonesia for 2017
Me and My Guitar
West Bali Police Send Home 18 Punkers on a Personal Sojourn in Bali
Passport to a Clean Bureaucracy
Indonesian Immigration Service Joins the Anti-Corruption Campaign
Welcoming the Ultra-rich to Indonesia
Indonesia Eases the Rules for the Visits by Private Yachts and Private Aircraft to Indonesia
Those in Knead
Bali Culinary Professionals Teach Bali Orphans How to Bake
A Galactic Calamity
Garuda Indonesia Ban Samsung Galaxy 7 Smart Phones from all Flights
Copping it for Murdering a Copper
David Taylor and Sara Connor Headed for Day in Court in Murder of a Balinese Policeman
Seeking New Connections
Provincial and Regency Sources Scramble to Raise Fund to Replace Pedestrian Bridge Between Nusa Lembongan and Nusa Ceningan
A Very Bad Exchange
French Exchange Student Arrested in Bali for Stealing a Motorcycle
Snake or Lizard?
Strange Reptile that Visited Bali Policemanís Home Has People Wondering: Is it a Snake or a Lizard?
Under Suspicion Again
Bali Police Acted Outside the Law in Halting Property Fraud Investigation Against Actor Jeremy Thomas
All [News]!