|
Bali Hai II Scheduled for April Dry Docking
Bali Hai Cruises Revamps Schedules and Services During Bali Hai II Docking March 29 – April 25, 2011.
(2/5/2011)
The popular Bali Hai II will be out of service from March 29, until April 25, 2011, to undergo a major refit and docking.
During this period, Bali Hai Cruises will be operating the following cruise program alterations:
• The [Lembongan Island Beach Club Cruises] will operate using the high-speed ocean raft departing at8:30 am and returning at 3:45 pm.
• The [Sunset Dinner Cruise] will not operate with the Bali Hai II during the docking period. Passengers will be served on the Aristocat for evening dinner cruises during this period.
• The [Ocean Rafting Dolphin Cruise] will not be available during the docking period of Bali Hai II..
© Bali
Discovery Tours. Articles may be quoted and reproduced
if attributed to http://www.balidiscovery.com.
|