Bali Discovery Tours: Homepage
Bali Hotels, Bali Villas and Bali News from balidiscovery.com
Home Bali Contact Bali Practicalities Bali News Bali Services Bali Transportation Bali Sports Bali Excursions Bali Villas Bali Hotels
Home · News · The Long and Winding Road to South Bali
Bali Hotels, Bali Villas and Bali News from balidiscovery.com
Bali Hotels
Bali Villas
Special Deals!
Packages
MICE Handling
Bali Excursions
Culinary - Dining
Guided Tour
Bali Spas
Bali Sports
Diving
Golf
Bali Transportation
Car Rental - Selft Drive
Private Jet Charter
Bali News
Bali Services
Bali Practicalities
Bali Contact
Bali Career
Home
 
Bali Update
Subscribe to our free weekly newsletter!
 
PATA header
PATA Gold Award 2007
Bali Update
PATA Gold Award Winner 2007
 
Bali Contact
Bali Discovery Tours
Komplek Pertokoan
Sanur Raya No. 27
Jl. By Pass Ngurah Rai,
Sanur, Bali, Indonesia

Tel:
++62 361 286 283

Fax:
++62 361 286 284

U.S.A. Fax:(toll free)
1-800-506-8633

U.K. Fax:
++44-20-7000-1235

Australian Fax:
++61-2-94750419

24h:
++62 812 3819724

Bali Discovery

SITE PATA ASITA
Bali News

The Long and Winding Road to South Bali

Latest Update on Ever-Changing Plans to Build a Bali Toll Way to Overcome Traffic Congestion.


Bali News: Bali, Indonesia, STB, JDR, Toll Way, Serangan Island, Bali Turtle Island, PT Jasa Marga, PT Pelindo III, PT Angkasa Pura, Bali Tourism Development Corporation (BTDC)
Click Image to Enlarge

(1/17/2011)

The ever-changing scenario to build new highways in Bali to overcome traffic congestion has entered yet another chapter. DenPost and Bali Post report that plans to build a toll road from Serangan island to Tanjung Benoa are being put aside in favor of an overpass constructed atop environmentally sensitive mangrove forests connecting south Denpasar (Pedungan) and Nusa Dua.

A Bali provincial spokesperson confirmed this to the press on Wednesday, January 12, 2011, reporting that the central government has approved the new plan after considering all the alternatives, including toll ways, undersea tunnels and flyovers. In the end, a decision has been made to provide support for a 11.5 kilometer elevated highway constructed over the mangrove forests in Bali's south.

Endeavoring to minimize the impact of the new road on the environmentally critical mangrove forest, the highways will be suspended on 1,000 supporting columns with an access point included near the airport access road. The new highway will also be designed to accommodate motorcycles as well as cars and trucks.

To fast-track the program the government will immediately embark on a two-month survey prior to granting work contracts to build the road which, by presidential instruction, must be completed in time for a major APEC conference set for Bali in 2013. A toll road, the project will be financed and managed by four State-owned enterprises: PT Jasa Marga, PT Pelindo III, PT Angkasa Pura and the Bali Tourism Development Corporation (BTDC).

Separately, the vice-chairman of the Bali House of Representatives (DPRD-Bali), Ketut Suwandhi, told the press that earlier plans to build a toll-way and bridge connecting Serangan Island (Turtle Island) with Tanjung Benoa have been prevented from moving ahead due to uncertain land titles on Serangan island, complicated further by the reported bankruptcy of the Turtle Island Development Corporation (BTID).

Concerns were also raised that a toll road incorporating a bridge connecting Serangan island and Tanjung Benoa would interfere with shipping access to the port of Benoa and approach-departure paths for aircraft using the Bali Ngurah Rai Airport.

Suwandhi said he hoped the new proposal to build a highway suspended over Bali's mangrove forests would not endanger the natural environment. At the same time, he acknowledged that some damage to the mangrove is inevitable and must result from the construction process of the new highway and that development plans must include a provision for reforestation after the road is built.

According to NusaBali the preliminary cost of the new suspended highway is put at Rp. 1.4 trillion or US$155 million.

Introducing JDR

Meanwhile, a report in NusaBali makes a new addition to the Bali lexicon. While the name for the originally proposed toll-way bridge project is locally referred to as "Jembatan Serangan Tanjung Benoa" or "STB" the name now given to the suspended highway over the mangrove forest is "Jalan di Atas Rawa" or "JDR."


© Bali Discovery Tours. Articles may be quoted and reproduced if attributed to http://www.balidiscovery.com.

       

 
Bali News by Bali Update
Subscribe to the Bali Update
Receive the latest news from Bali by email!



Our [Privacy Statement] explains how we handle the data you are providing.

 
Bali News by Bali Update
Explore the Archive of the Bali Update
Find related articles in our news archive!




or try to use Google Search :

Home · Bali Hotels · Bali Villas · Bali Excursions · Bali Sports · Bali News · Site Map · RSS

Bali News: More News
Kiwi’s Keen on Bali
Air New Zealand Looking to More than Double Passenger Capacity Between Auckland and Bali in 2018
(7/23/2017)
Silhouettes that Break Cold Sweats
Bali Police Install Replica Police Cars on Road Sides to Reduce Traffic Violations
(7/23/2017)
An Unexplained Death
New Zealander Dies After a Night of Drinking at an East Bali Hotel
(7/23/2017)
The Belgium Who Fell From Above
Belgium Tourist Commits Suicide By Jumping from Villa North of Ubud
(7/24/2017)
No Shortage of Oranges
Bali’s Kintamani Orange Prices Drop to Record Lows
(7/23/2017)
Purposely Vague Recollections
Man Beaten By Transvestites and Left Naked in a Bali Field Released from Hospital
(7/23/2017)
Now Infamously Famous
Actor Jeremy Thomas to Have His Day in Court on Charges of Embezzlement and Fraud in Ubud Property Case
(7/23/2017)
A Young Life Gone Up in Smoke
Italian Facing a Dozen Years in Jail for Three Joints of 'Ajapa-japa'
(7/23/2017)
Pursuing Princesses
Princess Cruise Lines Lists Improvements Needed to Attract More Cruise Ship Visits to Indonesia
(7/23/2017)
Tropical Cancer Care
Bali Developing Cancer Treatment Center at Mangusada General Hospital
(7/23/2017)
Arshole Incarceration
Madurese Laborer Get 12-years for Smuggling Methamphetamines Concealed in his Anus
(7/23/2017)
Faulty Towers
Bali-based Resistance to “Bali-Crossing” High Voltage Line Grows
(7/23/2017)
All [News]!